Permitting

Permits & inspections in Raleigh and Wake County

Who issues your permit depends on where your home sits — not on your mailing address.

City or county?

  • Inside Raleigh city limits: City of Raleigh Development Services issues residential permits through its online Permit and Development Portal.
  • Unincorporated Wake County: Wake County Permit and Inspections handles residential building permits.
  • Cary, Apex, Wake Forest, Garner, etc.: each town runs its own inspections department.

Use the Wake County iMAPS property lookup to confirm your jurisdiction before you apply.

Historic districts

Raleigh has local historic districts — including Oakwood, Boylan Heights, Blount Street, Capitol Square, Glenwood-Brooklyn, Moore Square and Prince Hall. Exterior changes visible from the street (additions, windows, porches, siding, fences, tree removal) need a Certificate of Appropriateness from the Raleigh Historic Development Commission before a building permit is issued.

  • Minor work (like-for-like repairs, some fences) is often approved by staff
  • Major work (additions, demolition, new windows) goes to a monthly commission hearing — add one to three months to your schedule
  • Interior work generally does not need a Certificate of Appropriateness

When is a permit required?

Under G.S. 160D-1110, residential work costing $40,000 or less needs no building permit unless it involves:

  • Adding, repairing or replacing load-bearing structures (window, door, siding and deck-board replacement excepted)
  • Adding or changing the design of plumbing
  • Adding, replacing or redesigning HVAC or electrical wiring (like-kind fixture swaps excepted)
  • Materials not allowed by the NC State Building Code, or new (not replacement) roofing

Typical application package

  • Site or plot plan showing setbacks (additions, decks, porches)
  • Construction drawings and, for structural work, sealed plans if required
  • Licensed contractor information for each trade
  • Owner-builder affidavit if you are acting as your own contractor

Inspection checklist

Track your project — never let work be covered before the matching inspection passes.

0 of 6 complete. Fees and processes change — confirm current requirements with your permitting office.